Saudi Aramco Inspection Checklist Fill Placement And Compaction
Saudi Aramco Inspection Checklist Fill Placement And Compaction This document is a checklist for inspecting fill placement and compaction. it lists acceptance criteria for items like lift thickness, compaction levels, and grading. acceptance criteria reference standards documents and require the fill to be placed and compacted properly, with compaction levels ranging from 70 95% depending on the material and loadings. the checklist will be used by saudi. 1) the document is a checklist for inspecting fill placement and compaction at a saudi aramco construction project. 2) it contains acceptance criteria for items like lift thickness, compaction levels, slope requirements, and grading. 3) references and standards are provided from sources like saes a 114 and sacsm to evaluate if work meets specifications.
Saudi Aramco Inspection Checklist Pdf Nature This document is a saudi aramco inspection checklist for fill placement and compaction. it lists acceptance criteria for items like lift thickness, placement near structures, grading, and compaction requirements. criteria include proper lift thickness, using hand equipment within 1.2 meters of structures, symmetrical placement, and achieving specified density thresholds under different types. Saes a 114. feb 1, 2022 •. 0 likes • 447 views. ai enhanced description. a. ahmedhashem483214. this document provides requirements for excavation, backfill placement and compaction for construction projects at saudi aramco. it defines relevant terms and references other saudi aramco standards. the contractor must implement quality control. A a saudi aramco inspections checklists with plans cvl s no. satip saic no. title qr number 1 satip a 114 01 earthwork site preparation, excavation and backfill during construction cvl 1 saic a 1001 soil sampling, testing and review of test reports final cvl 7 saic a 1007 geotechnical investigation requirements cvl 2 saic a 1002 fille,select fill, marl cap inspection cvl 3 saic a 1003 soil. Quality plans, applicable procedures, and purchase order requirements.12.1.2 the inspection quality plan shall list all applicable inspection and testing r. quirements along with level of involvement for each inspection entity.12.1.3 the manufacturer shall maintain inspection and testing records and c.
Saudi Aramco Inspection Checklist Pdf Business A a saudi aramco inspections checklists with plans cvl s no. satip saic no. title qr number 1 satip a 114 01 earthwork site preparation, excavation and backfill during construction cvl 1 saic a 1001 soil sampling, testing and review of test reports final cvl 7 saic a 1007 geotechnical investigation requirements cvl 2 saic a 1002 fille,select fill, marl cap inspection cvl 3 saic a 1003 soil. Quality plans, applicable procedures, and purchase order requirements.12.1.2 the inspection quality plan shall list all applicable inspection and testing r. quirements along with level of involvement for each inspection entity.12.1.3 the manufacturer shall maintain inspection and testing records and c. 1200 mm. saudi aramco standard typical installation. at least 1 meter separation from hydrocarbon pipelines mechanical protection. at least 5 meter separation distance parallel with hydrocarbon pipeline w out protection. concrete encasement is the method when providing mechanical protection for foc. marker tape marker posts every 152 meters. Inspection & testing agency 5.1.1 the contractor's quality control testing requirements shall be performed by either a saudi aramco approved independent testing agency or by the contractor's own laboratory, approved by the saudi aramco inspection department. 5.1.2 all required laboratory and field acceptance tests required in section 6.3.3.
Saudi Aramco Inspection Checklist Saic M 1014 Pdf Pdf Roof 1200 mm. saudi aramco standard typical installation. at least 1 meter separation from hydrocarbon pipelines mechanical protection. at least 5 meter separation distance parallel with hydrocarbon pipeline w out protection. concrete encasement is the method when providing mechanical protection for foc. marker tape marker posts every 152 meters. Inspection & testing agency 5.1.1 the contractor's quality control testing requirements shall be performed by either a saudi aramco approved independent testing agency or by the contractor's own laboratory, approved by the saudi aramco inspection department. 5.1.2 all required laboratory and field acceptance tests required in section 6.3.3.
Saudi Aramco Inspection Checklist Fill Placement And Compaction
Saudi Aramco Inspection Checklist Pdf Civil Engineering Composite
Comments are closed.